How to Make a Waterproof Screed | Cementmix DIY Guide

Mixing mortar for a waterproof screed with Cementmix

Waterproof screed is ideal for floors in bathrooms, basements and rooms with underfloor heating. By replacing all mixing water with Cementmix, you create a cement screed that is permanently waterproof from within while remaining vapour permeable.

This step-by-step guide explains how to make a waterproof screed, level it correctly and allow it to cure for a durable result.

Cementmix makes waterproof concrete, cement and mortar permanently waterproof from within by replacing the mixing water.

For a general explanation of how screed works as a level base for flooring, read Holcim’s guide to screed.

Why use a waterproof screed?

A waterproof screed creates a durable, level floor layer that is protected against moisture from within. It is a good choice for bathrooms, utility rooms, basements, garages and floors with underfloor heating. Cementmix completely replaces the mixing water, so the waterproofing becomes part of the cement-based material rather than a coating on top. The cured screed remains vapour permeable and can be finished with suitable flooring once it has cured.

What you need to make a waterproof screed

  • Cementmix, which replaces the water in the mixing process
  • Leveling mortar or cement
  • Long lath / level
  • Grout trowel
  • Bucket / wheel-barrel / concrete mixer
  • Straightedge and shovel
  • Enthusiastic energy 🙂
Levelling a waterproof cement screed mixed with Cementmi

Note: You can also use Permacon for waterproofing existing concrete.

Preparing the floor before applying screed

The surface must be clean, sound and free from dust, loose material and grease. Repair significant cracks or damaged areas before applying a new screed. Check the floor level first, because an uneven base can result in thin spots and an uneven finish. Mix and apply the screed at temperatures between 5°C and 25°C, and always replace the full amount of mixing water with Cementmix.

Step-by-step guide on how to make a waterproof leveling mortar / screed / concrete floor / concrete layover

  • Measure the floor area and decide how thick the new screed needs to be.
  • Check the cement or screed bag to see how much mixing water is required per bag.
  • Multiply that amount by the number of bags you need. This is the amount of Cementmix required for the job.
  • Make sure the existing floor is clean, sound and level. Remove dust, loose material and grease before you start.
  • Mix the cement or levelling mortar using Cementmix instead of water.
  • Start in the furthest corner of the room and work your way back towards the exit.
  • Spread the screed evenly using a shovel or squeegee.
  • Use a straightedge to level the screed and maintain the correct height.
  • Smooth the surface once the screed has been levelled.
  • Allow the screed to cure. You can usually walk on it after 24 to 48 hours, but full curing takes around 28 days.

Waterproof screed with Cementmix

When the screed has cured, it forms a durable and permanently waterproof floor layer. Because Cementmix replaces the mixing water, the protection is built into the screed instead of being applied as a separate coating afterwards. This makes it a reliable solution for new floors, levelling mortar and cement-based repairs in areas where moisture protection is important.

Mixing a waterproof cement screed with Cementmix instead of water

Aftercare and curing of waterproof screed

Protect fresh screed from frost, direct rain and rapid drying while it cures. Avoid heavy loads and do not install the final floor finish until the screed has gained sufficient strength. Drying time depends on the screed thickness, temperature and ventilation in the room. As a guide, the floor can often be walked on after 24 to 48 hours. Allow around 28 days for full curing and maximum waterproof performance. Always follow the recommendations supplied with the cement or screed you are using.